TapeOut.linknews

协议费改收 BEM:新处理器 0.1 BEM、Mint 每笔 0.01 BEMProtocol Fees Switch to BEM: 0.1 BEM per New Processor, 0.01 BEM per Mint

社区速览汇总协议费改收 BEM 的细则:新建处理器收费 0.1 BEM,Mint 晶体管每笔 0.01 BEM,其中 50% 销毁。矿工挖出的 BEM 由此正式成为进入 TapeOut 的门票,形成挖矿产出与建设消耗两侧的衔接。同一速览称电路数已过 8 万、矿机约 2 万台、日产稳定 7,200 BEM,并提到 TapeUP 将基于本次升级推进 ITO,规则已写入合约。A community roundup detailed the protocol's switch to BEM fees: 0.1 BEM to create a new processor and 0.01 BEM per transistor minted, with 50% of that burned. BEM mined by miners thus formally becomes the ticket into TapeOut, linking mining output on one side with build-side consumption on the other. The same roundup said circuits have passed 80,000, miners number about 20,000, and daily output is steady at 7,200 BEM, and noted that TapeUP will push its ITO based on this upgrade, with the rules already written into the contract.

来源 · 23 条Sources · 23

查看原推文View on X 更多动态 · 新闻频道More updates

评论Comments

    还没有评论,来说两句No comments yet