TapeOut 地铁站:1,163 个验证节点,负载 53.35%
社区成员引用 TapeOut 地铁站页面数据:验证电路收益分成年化 15,187.77%,当前线路负载 53.35%,全网验证节点 1,163 个。按其计算,线路负载刚过一半,仍有约 46.65% 的负载空间。该成员认为,随着生态发展,电路验证、节点运营与链上收益分配正在逐步形成独立的经济体系,并建议未参与者先研究机制再决定是否购买地铁站、参与质押。A community member cited data from the TapeOut metro-station page: verification circuit revenue share is quoted at an annualized 15,187.77%, current line load at 53.35%, and 1,163 verification nodes network-wide. By that math the line is just over half loaded, leaving roughly 46.65% of capacity. The member argued that circuit verification, node operation and on-chain revenue distribution are forming their own economic system as the ecosystem grows, and suggested newcomers study the mechanics before buying a station and staking.
